Sponsors

‘Highest infection control standards’ met

Installation of ‘one of the world’s most advanced’ laminar clean airflow canopies has helped an operating theatre at a multi-million pound healthcare facility ‘meet the highest industry standards for infection control’.

Bender UK supplied, installed, and commissioned the operating theatre clinical resource on the Cheshire/ Merseyside border, owned and operated by Pall Mall Medical. 

The main operating theatre presented a significant challenge due to restricted space, but an Admeco advanced performance canopy enabled Bender to optimise clean airflow to achieve the highest NHS standard and UK HTM 03-01A criteria.

Admeco canopies offer ‘high performance and low noise levels’ from the integral fans, and the model chosen incorporates a media bridge which replaces conventional services pendants. Differential distributors (laminisers) allow a targeted accelerated airflow in a defined zone of the outlet field. 

 

Latest Issues