Electronic water control specialists ECO-Logic UK has just completed a project at Malcolm Arnold House, a 48-bed secure mental health facility at St Andrews Hospital in Northampton.
Fittings included basin, WC, bath and shower controls and secure vandal-resistant/anti-ligature sanitaryware for the ensuite bathrooms, patient toilets, seclusion rooms and assisted bathrooms. ECO-Logic electronic water fittings provide users with easy-to-use controls, but ensure high levels of discreet management input including timed flow with auto-stop at selected levels – ideal for baths, basin and sinks. Anti-tamper lockouts, restart delays, flood sensors and blockage alerts are also available, as well as cell call systems and lighting/heating controls ideal for high-risk clients.
Due to the success of the installation, ECO-Logic electronic water controls and secure polymer and stainless steel sanitaryware are being specified for a potential further four hospitals as well as ECO-Logic controls for other areas throughout St Andrews Hospital due to the water, energy and maintenance cost savings available.