The website of the Health Estate Journal

Are UK cable testing systems fit for purpose?

In an article first published in Australian magazine, Healthcare Facilities, a mineral insulated cable specialist discusses the potential consequences should the electrical wiring systems that connect vital fire safety systems fail during a fire, and actions to take to minimise the risk.

In an article entitled ‘Are your life safety & firefighting systems fit for purpose’ published in Healthcare Facilities, the journal of The Institute of Healthcare Engineering, Australia, Richard Hosier, regional manager, Asia/Pacific at MICC Group, discussed some of the potential consequences should the electrical wiring systems that connect vital fire safety systems fail during a fire, key measures to take to minimise the chances of such failure, and the prevailing regulations and standards in Australia governing such key criteria as the fire resistance and fire retardance of such cabling. Here he focuses on what he sees as some of the key anomalies in current UK Building Regulations as regards fire testing of such cabling, and highlights the more stringent requirements in force in the US.

Today the UK Building Regulations Approved Document B adopts the standard time/temperature protocol of ISO834-1 in BS476 parts 20 to 24 for fire resistance testing of all building elements such as fire doors, fire stopping systems for penetrations, structural elements, fire walls and partitions – in fact every material, component, and product used in a building that is required to have a fire resistance rating. What is often overlooked is that this time/temperature protocol for fire resistance testing (ISO834-1/EN1363-1, aka the standard time temperature curve) was developed almost 100 years ago, when buildings and contents were commonly made of masonry, wood, and fabric. At this time plastics and synthetic materials did not exist.1 Furthermore, buildings of this age were mostly not very tall or very large. Today our built environment is far more complex, and inclusive of small domestic, industrial/commercial buildings, super high-rise, mega-interconnected transportation, retail, and commercial structures with significant below ground environments, and especially healthcare facilities, where large numbers of people have no or limited mobility. Across these building types we have a large range of evacuation times, and where these egress times are very long, designers and engineers need to look for alternative, more innovative, solutions for evacuation or protection of occupants, such as reducing fire loads, lift evacuation, or ‘protect in-place’ refuges.

Five profiles above original parameters

Log in or register FREE to read the rest

This story is Premium Content and is only available to registered users. Please log in at the top of the page to view the full text. If you don't already have an account, please register with us completely free of charge.
Register

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Step Communications Ltd, Step House, North Farm Road, Tunbridge Wells, Kent TN2 3DR
Tel: 01892 779999
www.step-communications.com
© 2024 Step Communications Ltd. Registered in England. Registration Number 3893025