Kemper System’s cold-applied liquid waterproofing solution has been specified for a multi-million-pound extension at the St John and St Elizabeth Hospital in the St John’s Wood area of London.

The £35 m new-build development has created six hi-tech theatres and a day case suite, which is reportedly one of the most modern in the UK. The extension also includes a new admissions lounge, imaging department, consultant rooms, and an expanded Urgent Care Clinic. A total of 9,060 m2 of Kemper System’s Kemperol 2K-PUR solvent-free, odourless waterproofing membrane has been applied beneath the building’s green roof – onto a pedestrian trafficked walkway, the lower roof area, and a plant roof area. The cold-applied solution was installed by London-based Ridgewell Flat Roofing.  Contractors had a strict timescale to adhere to, meaning a quick and easy application solution was required to complete the job.

The new-build extension is adjacent to an occupied building l, and the solvent-free and odourless qualities of the Kemperol system helped minimise disruption at the hospital throughout the application process. No hot works were required, further reducing potential health and safety risks, and meaning no wait between applications of resin. Once cured, the system forms a seamless, elastomeric waterproof membrane that cannot delaminate, is UV stable, and creates a sturdy bond directly to the substrate. Additionally, the plant roof area had a number of complexities, with many ventilation outlets and air-conditioning units, and because Kemper’s waterproofing system is roller-applied, operatives could easily install the resin underneath the units and around the complex roof structure.

Ben Ridgewell, managing director of Ridgewell Flat Roofing, said: “We have used Kemper System for many years, and the cold-applied solution was perfect for this project because it is so versatile. We could apply the system to each of the different roof and walkway areas with ease without having to switch roofing materials. Kemper System once again delivered on such a complex project, which presented winter working challenges, specifically with high winds at times. Large expanses of sheeting material would not have been practical or safe on site, so a roller-applied liquid waterproofing solution was the best option for this project. We were extremely happy with the results, and so is the end client.” 

Victoria Ramwell, Commercial manager at Kemper System, added: “We are delighted that our solution was specified for such a fantastic project, showcasing its versatility on both new- build and refurbishment works. Our Kemperol 2K-PUR solution is manufactured using an 80 per cent castor-oil formula derived from sustainable sources. The system has stood the test of time, with a proven 20-year track record, and continues to be one of the most popular and sought-after systems for all sorts of projects.”

 

 

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Step Communications Ltd, Step House, North Farm Road, Tunbridge Wells, Kent TN2 3DR
Tel: 01892 779999
www.step-communications.com
© 2024 Step Communications Ltd. Registered in England. Registration Number 3893025