The website of the Health Estate Journal

Gerflor flooring and Gradus wall protection for Whitby hospital redevelopment

Gerflor has supplied over 7000 m2 of its ‘high-quality flooring’, and a selection of Gradus handrails and corner guards. for a complete re-development and refurbishment of the site and building at Yorkshire’s Whitby Community Hospital, undertaken under a ProCure 22 project.

The company explains that its flooring and interior finishing solutions are treated with patented surface treatments that ‘provide an unrivalled level of chemical and stain resistance’. Gerflor said: “The world-class vinyl and linoleum collections are perfectly suited to  hard-working healthcare spaces, including those subject to intensive 24-hour movement of beds, trolleys, wheelchairs, and heavy medical equipment.”

Gradus, meanwhile, is a manufacturer of ‘comprehensive contract interior solutions’ – including stair edgings, floor trims, barrier matting, and wall protection. Gradus solutions are reportedly ‘proven to enhance the longevity of a building, while reducing long-term maintenance costs’. It works ‘in partnership’ with the healthcare sector ‘to ensure that buildings are safe and accessible for all users’.

Whitby Hospital is a community hospital that provides inpatient, outpatient, and community services. Medical Architecture has overseen and masterminded the major redevelopment project there. Gerflor explained: “The newly configured community hospital – which Medical Architecture designed – bridges the gap between home and specialist hospital care, through the delivery of both outpatient and inpatient services in Whitby.”

 

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Upcoming Events

The Fire Safety Event 2024

National Exhibition Centre (NEC), Birmingham
30th April - 2 May 2024

Wales regional conference, exhibition and awards dinner 2024

International Conference Centre (ICC) Newport
28th - 29th May 2024

NAHFO National Conference 2024

Crowne Plaza Newcastle Upon Tyne
3rd - 5th June 2024

Design in Mental Health 2024

Manchester Central
4th - 5th June 2024

InstallerSHOW 2024

National Exhibition Centre (NEC), Birmingham
25th - 27th June

Healthcare Estates 2024

Manchester Central
8th-9th October 2024

Access the latest issue of Health Estate Journal on your mobile device together with an archive of back issues.

Download the FREE Health Estate Journal app from your device's App store

Step Communications Ltd, Step House, North Farm Road, Tunbridge Wells, Kent TN2 3DR
Tel: 01892 779999
www.step-communications.com
© 2024 Step Communications Ltd. Registered in England. Registration Number 3893025