Sponsors

Different approach

MTX says its new buildings can incorporate concrete floors, and can be designed with a design life ‘of up to 60 years’.

Alongside providing new-build, ‘bespoke’ operating theatres, MTX has extensively remodelled and refurbished existing theatre environments directly for the NHS. It said: “Currently, however, we have little involvement in ProCure21+ theatre projects, and believe there are significant client benefits if PSCPs appoint a theatre specialist, rather than opting for traditional self-delivery. “We can quickly mobilise, and, given a suitable pre-construction design period, approach projects from an alternative ‘angle’, following a ‘design for manufacture’ process that reduces programme, cost, and end-user disruption, via pre-construction of mechanical and electrical service modules, and modular M&E sub-distribution systems. Other elements, such as walls, doors, and ironmongery, can be pre-constructed and delivered ‘flat pack’, ready for assembly.”

Latest Issues