SWORD, the international IT products and services company, has launched a document control system aimed at significantly reducing the costly delays associated with existing systems used in complex projects by the engineering, energy, transport and other industrial sectors.
The risk of errors caused by the use of outdated versions of documents is eliminated as all users work from the same base of documentation, which is instantly available online, eliminating delays in retrieving and printing documents.
SWORD claims that information can be accessed remotely from multiple sites, eliminating the need to create physical or electronic copies of documentation and further reducing the risk of using outdated copies.
The company will be running a series of eight seminars across the UK showing how C2Share enhances Microsoft’s SharePoint 2007 to provide additional Document Management and Transmittal capabilities. The seminars will focus on how the product provides the extra functionality needed to control the complex information and information flows typically found within a project environment.